top of page

Rudder

  • Administrator
  • Jan 2, 2018
  • 1 min read

Two months of intensive building time have produced a result. The rear rib sections are made and installed, including the vertical spars, trailing edge, and the trim tab cut-out. The rudder is built together with the fin and will only be separated later.

 
 

PROGRESS

bottom of page